News
Home > News /

2020 Notice of commencement

0 Author 2020-02-26 14:21:58

The Chinese government attaches great importance to the outbreak of new coronavirus-infected pneumonia during the Spring Festival, and takes the prevention and control of the epidemic as the top priority.Measures to strengthen prevention:
      Check the staff in place, know the whereabouts of each employee in the past 14 days, notify the staff to return to the company after the 14 days observation period, work at home during the observation period, do a good job in the situation registration to ensure that no one left.Pay close attention to the physical and mental state of the people in hubei and other provinces, and guide them in time.
      Formulate ventilation, disinfection and sanitation management measures for public places, conduct disinfection prevention twice a day for office areas, canteen, dormitory, toilet and elevator in the factory, place disinfection wipes in the office and hand sanitizer in the toilet and public areas to ensure the safety of the regional environment, Adjust the office space, adjust the adjacent posts to maintain a safe distance. Adopt scattered repast, eat at different times, avoid group repast. Try to use online meetings such as WeChat, video and audio instead of offline meetings to reduce personnel gathering. Checkpoints were set up at the gate to ask people to wear masks, check their temperature one by one, sterilize and register their temperature.
      Extensive online and offline publicity.Post offline epidemic prevention publicity, actively guide staff to cancel outings and parties, and continuously strengthen staff awareness of epidemic prevention;Online use of WeChat and other networks to promote official policies, mainstream media epidemic prevention news and scientific protection knowledge, to ensure that the new coronavirus prevention and control publicity popular.
      On February 10, AVWOO passed the on-site review of the municipal competent department of commerce and completed the filing approval.February 17, according to the plan to resume work, through the temperature test to enter the Shenzhen factory. Up to February 26, the company resume work rate of 85%, no personnel confirmed, suspected and isolated.

 

 

< >